The wind farm, which is scheduled to go into operation by the end of the year, will consist of 50 wind turbines erected on monopile foundations (10.05.2024, Gulf Business)
The wind farm, which is scheduled to go into operation by the end of the year, will consist of 50 wind turbines erected on monopile foundations (10.05.2024, Gulf Business)